Search:

Two Lines of 132kV Underground Cables Project Tareq – Bayader and Amman South – Abdoun. (Turn-key)

Sunday

2009-08-30

This project comprises of 132kV underground cables which consist of double circuit , one cable per phase and one FO earth cable per circuit. And Distribution temperature sensing system. 1- Tareq - Bayader line with total route length of 14km and the first circuit was energized on 27/03/2007and the second circuit was energized on13/03/2007 2- Amman South - Abdoun line with total route length of 7.5km and the first circuit was energized on05/12/2006 and the second circuit was energized on 21/11/2006 . This project was executed by LG Corp.
Attachments